Installation, Series 2103 and 23xx – Burkert Type 8696 User Manual

Page 12

Advertising
background image

12

Installation

7. INSTALLATION

Only for positioner without pre-assembled process valve.

7.1. Safety instructions

DANGER!

Risk of injury from high pressure!
• Before dismounting pneumatic lines and valves, turn off the

pressure and vent the lines.

Risk of electric shock!
• Before reaching into the device or the equipment, switch off the

power supply and secure to prevent reactivation!

• Observe applicable accident prevention and safety regulations

for electrical equipment!

WARNING!

Risk of injury from improper installation!
• Installation may be carried out by authorized technicians only

and with the appropriate tools!

Risk of injury from unintentional activation of the system and
an uncontrolled restart!
• Secure system from unintentional activation.
• Following assembly, ensure a controlled restart.

7.2. Installation of the positioner on

process valves of series 2103 and
23xx

Procedure:

When the positioner is being installed, the collets of the pilot
air ports must not be fitted to the actuator.

Align the puck holder and the positioner until
1. the puck holder can be inserted into the guide rail of the

positioner (see “Fig. 5”) and

2. the supports of the positioner can be inserted into the pilot

air ports of the actuator (see also “Fig. 6”).

NOTE!

Damaged printed circuit board or malfunction!
• Ensure that the puck holder is situated flat on the guide rail.

Guide rail

Puck holder

Supports

Fig. 5:

Aligning the puck holder

english

Type 8696

Advertising