Appendix d. troubleshooting, Table d1, D. t – CTI Products NCB/FL with Fiber Interface User Manual

Page 31

Advertising
background image

CTI Products, Inc.

NCB-EL/FL User Guide

Appendix D. Troubleshooting

28

A

PPENDIX

D. T

ROUBLESHOOTING

Table D1

If the PWR LED . . .

REASON

CORRECTIVE ACTION

Is always illuminated.

Normal operation indicating that NCB unit

is receiving proper DC input power.

Go to next Table.

Does not illuminate.

NCB unit is not receiving DC input power.

Check for proper voltage at “DC IN”

connector (10-32VDC).

Table D2

If the ERR LED . . .

REASON

CORRECTIVE ACTION

Is always off.

Normal operation indicating no error

condition was detected.

Go to next Table.

Occasionally blinks on, then

off.

Normal operation when “CSVC” button or

“RSVC” button is pressed.

Go to next Table.

Flashes slowly, at a rate of

once every 2 seconds.

The Router Neurons are unconfigured.

Use a network management tool to

‘Replace’ or ‘Commission’ router,
or
Use NODEUTIL to change the
mode/state to ‘Configured’ and ‘On-
line’,
or
Use SETRTR –F to configure the
router to Factory default conditions
(Repeater Mode).

Flashes quickly, at a rate of

once every second.

The Control Neuron Processor detects

missing IP address information.

Use EtherPlug to update the IP address

parameters. (See Installation section
for instructions.)

Is always illuminated.

Router module, or Control Neuron

Processor, or Microprocessor is not
functioning.

Call CTI Products, Customer Support (+1-

513-595-5900), to arrange to return
unit for evaluation/repair.

Table D3

If the ETH TX LED (on

local NCB) . . .

REASON

CORRECTIVE ACTION

Occasionally blinks on, then

off.

Normal operation indicating a message

packet has been transmitted from the
Ethernet port.

Go to next Table.

Does not illuminate when

“RSVC” button on local
NCB is pressed.

Ethernet port is not terminated correctly to

the IP network.

a.

Verify that OPTION switch positions 7
and 8 are set correctly for the Ethernet
connector being used. See Step 6A in
Installation section.

b.

Verify that the cable from NCB
Ethernet port is terminated correctly to
IP network. Check the ‘connection’
LED that is found near each port on
most IP interconnect devices.

c.

Verify that the correct cross or straight-
through cable is being used. See
“Appendix F. IP Addresses”.

Advertising
This manual is related to the following products: