Power and ground wiring connections, Typical installation – Controlled Products Systems Group CDO MD L/H Hoist 1/2hp 115v User Manual

Page 11

Advertising
background image

11

POWER WIRING CHART

TYPICAL INSTALLATION

To reduce the risk of SEVERE INJURY or DEATH:
• ANY maintenance to the operator or in the area near the

operator MUST NOT be performed until disconnecting the
electrical power and locking-out the power. Upon completion
of maintenance the area MUST be cleared and secured, at that
time the unit may be returned to service.

• Disconnect power at the fuse box BEFORE proceeding.

Operator MUST be properly grounded and connected in
accordance with local electrical codes. The operator should be
on a separate fused line of adequate capacity.

• ALL electrical connections MUST be made by a qualifi ed

individual.

• DO NOT install ANY wiring or attempt to run the operator

without consulting the wiring diagram.

• ALL power wiring should be on a dedicated circuit and well

protected. The location of the power disconnect should be
visible and clearly labeled.

• ALL power and control wiring MUST be run in separate

conduit.

ATTENTION

AVERTISSEMENT

AVERTISSEMENT

AVERTISSEMENT

WARNING

CAUTION

WARNING

WARNING

WARNING

PRECAUCIÓN

ADVERTENCIA

ADVERTENCIA

ADVERTENCIA

POWER AND GROUND WIRING CONNECTIONS

NOTE: Power and control wiring must be run in separate conduit
in accordance with national and local electrical codes. Must use 14
AWG or heavier wire for power wiring. Use conduit knockouts for
wiring as indicated on the electrical box labels.

IMPORTANT NOTE: Operator must be properly grounded. Failure
to properly ground the operator could result in electric shock and
serious injury.

DISTANCE

GAUGE

50 feet

14 AWG

100 feet

12 AWG

200 feet

8 AWG*

350 feet

6 AWG*

500 feet

4 AWG*

1000 feet

2 AWG*

* Maximum wire gauge that can be connected to the operator’s

terminal is 12 AWG. When a larger wire gauge is required, the
wire must be gauged down to 12 AWG. USE COPPER WIRE ONLY.

Remove cover.

Electrical Box Cover

1

Run power wires to electrical box according to national and
local electrical codes.

Conduit

Electrical Box

Sealing Nut

(Not Provided)

2

DO NOT turn power on until you have fi nished making ALL power
and control wiring connections.

Advertising
This manual is related to the following products: