Important, Continuous injection system (cis) setup procedure – MotorVac CarbonClean Dual System MCS 352 User Manual
Page 28
Continuous Injection System (CIS) Setup Procedure
WARNING: BEFORE BEGINNING THE RAIL FLUSH PROCEDURE IT IS
IMPORTANT TO TEST THE VEHICLE FOR INJECTOR LEAKDOWN. IF AN
INJECTOR IS STUCK OPEN IT IS POSSIBLE TO DAMAGE THE ENGINE DUE
TO ‘HYDROLOCK”. (LIQUID FILLING THE CYLINDER). IF THE VEHICLE
HAS INJECTOR LEAKAGE DO NOT DO THE RAIL FLUSH, PROCEDE
DIRECTLY TO THE ENGINE RUNNING-CLEANING PROCESS.
Follow the steps below to connect the unit to the vehicle's fuel system. Make sure the
vehicle has at least 1/8 tank of fuel before beginning this process.
1.
Start the vehicle and allow the engine to reach normal operating temperature
.
IMPORTANT
Do not perform the setup or cleaning process if the
vehicle’s engine oil or coolant level is low. If
necessary, add oil and/or coolant to the vehicle.
2.
Turn the vehicle OFF
when normal operating temperature has been reached.
3.
Turn the
Gasoline (Petrol)
PRESSURE
REGULATOR
counterclockwise until the regulator is
completely open. Verify that the
ON/OFF
switch is turned
off.
4.
Attach the unit to the vehicle's battery by connecting the
red
battery clip to the positive (
+
)
battery terminal and the
black
battery clip to a solid ground point as far from the battery as
possible. Press the SERVICE SELECTOR switch to the side with Gasoline (Petrol) FUEL
SYSTEM SERVICE.
5.
Remove the vehicle's gas cap to relieve fuel tank pressure.
6.
Disconnect the vehicle’s fuel lines from the fuel distributor. There are now four open ends to
work with:
Pressure
Line
Return
Line
From the fuel tank to the fuel
distributor.
From the fuel distributor to the
fuel tank.
7.
Add a pre-mixed gasoline and detergent mixture to the right side (gasoline /petrol) reservoir.
When filling the reservoir, add
1 oz. (30 ml.) of Detergent to 3 oz. (90 ml.) gasoline per
cylinder.
See page 3-3 for alternate filling method (Refer to page 3-2 for the proper ratios.)