5 4-function valve installation – Nova-Tech LMI Series AA-B-C-E-J-P Metering Pumps User Manual

Page 18

Advertising
background image

18

4.5

4-Function Valve Installation

• To mount to a pump, remove the discharge fitting from the pump

(if present) leaving the cartridges in the pump head. Position the

4FV coupling nut on pump head over cartridges with threads up,

and insert 4FV fitting and thread into pump head over cartridges.

Tighten the fitting to 50 in-lbs using a 13/16” or 20 mm socket. Insert

the large opening on the 4-Function valve into the 4FV coupling nut

and hand tighten. You can position the valve to have the pressure

relief port in any convenient location by tightening the 4FV coupling

nut with the pressure relief port positioned 90º CCW from desired

location, then holding the nut stationery while turning the valve the

final 90º to desired position.

• Connect 1/4” tubing to the pressure relief port and route to supply

container.

• Connect discharge line using LMI tubing connection system or 1/2”

pipe thread.

The 4-Function Valve is designed for double¬ballchecks. A second

valve cartridge is required when mounting a new 4-Function Valve

to an existing pump with a 300, 400 or 700 liquid end.

4-Function Valve Tubing Connection

Advertising