0 pre-installation instructions – Nova-Tech LMI Series AA-B-C-E-J-P Metering Pumps User Manual

Page 8

Advertising
background image

8

3.0 Pre-Installation Instructions

The following precautions should be taken when working with

LMI metering pumps. Please read this section carefully prior to

installation.


Precautions

Protective Clothing

ALWAYS wear protective clothing, face shield, safety glasses

and gloves when working on or near your metering pump. Ad-

ditional precautions should be taken depending on the solution

being pumped. Refer to MSDS precautions from your solution

supplier.

Water Pre-Prime

All LMI pumps are pre-primed with water when shipped from

the factory. If your solution is not compatible with water, disas-

semble the Pump Head Assembly. Thoroughly dry the pump head,

valves, seal rings, balls and Liquifram

(diaphragm). Reassemble

head assembly tightening screws in a crisscross pattern. Refill

the pump head with the solution to be pumped before priming

the pump. (This will aid in priming.)

Solution Compatibility

Determine if the materials of construction included in the liquid

handling portion of your pump are adequate for the solution

(chemical) to be pumped. LMI pumps are tested by NSF for

use on muriatic acid (up to 37% hydrochloric acid), and sodium

hypochlorite (up to 12.5% solution). Always refer to the solution

supplier and the LMI Chemical Resistance Chart for compat-

ibility of your specific LMI metering pump. Contact your local

LMI distributor for further information.

CAUTION

!

CAUTION

!

CAUTION

!

Advertising