Stacking instructions, Stacking configurations – Alto-Shaam Cook User Manual

Page 9

Advertising
background image

S I T E I N S T A L L A T I O N

I N S T A L L A T I O N

Stacking Configurations

767-SK/III with 767-SK/III, 750-TH/III,

750-TH-II, 767-SK, or 750-S

767-SK/III, 1767-SK/III, 2800-SK/III

INSTALLATION

/

OPERATION

/

SERVICE MANUAL

PG

. 7

CASTER SET
SCREW

TOP
MOUNTING
SCREWS

STACKING
POSTS

TOP
MOUNTING
SCREWS

STACKING INSTRUCTIONS

1) If the two appliances were shipped together from the factory, the top unit will have the

casters already removed. A stacking kit will be included with the shipment.

If casters need to be removed: lay the unit on its back, and remove the set screw on each caster. Pull the

casters out of the unit.

2) While appliance is laid on its back, insert one stacking post in each of the four corners

of the upper unit. Secure the stacking posts using one screw and two flat washers that
come with the stacking kit.

Note:

The flange on the stacking posts must face the outside of the unit.

3) Remove the four top mounting screws from the lower unit. Place the upper appliance,

which has the stacking posts installed, on top of the bottom unit. Center the top
unit from front to back. Re-install the four screws through the flange of the four
stacking posts.

Advertising
This manual is related to the following products: