12

4111-0023 — Jan. 2012

NOTE: Poweramp

®

dock levelers are designed with a

nominal 1/2 in. (12.7 mm) shimming distance

to allow for pit inconsistencies.

1. Determine height of shim stack (L) for each shim

location (B) by performing the following:

a. Measure leveler frame height distance (A).

b. Measure dock floor-to-pit floor distance (J)

at each shim location (B). Write down the

dimensions obtained at each location.

c. Subtract distance (A) from distance (J) to obtain

the shim height. Repeat for each shim location.

5. Using an appropriate lifting device connected to the

lifting brackets, lower dock leveler into the pit so

rear hinge frame angle (H) is tight against rear pit

curb angle (F) across full width of the leveler frame.

6. Allow rear of dock leveler to rest on the rear shims

while keeping the front of the dock leveler level with

the dock floor.

7. For all CA models, add shims at front shim

locations (C and D) so front of dock leveler will stay

level with dock floor when leveler is resting fully on

shims.

4. For all CentraAir™ models, put a 1/4 in. (6.6 mm)

thick shim at locations (C and D) .

NOTE: A 1/4 in. (6.6 mm) thick shim at locations (C

and D) is used only as a starting point. The

final shim stack height will be determined after

dock leveler is lowered into the pit.

2. Using the results obtained in step 1, create the

individual shim stacks on the pit floor at locations

(B). Build each shim stack (L) using the pyramid

method (N) (preferred) or stepped method (P) with

the top shim having a minimum size of 4-1/2 x 4-1/2

in. (114.3 x 114.3 mm) and each successive lower

shim being larger so the shims can be welded

together using a fillet weld. DO NOT use offset

method (Q) or straight method (R).

NOTE: To assist in obtaining an accurate measurement

of distance (K), use a string (G) pulled tight

across the pit opening, directly over the shim

locations.

3. Verify that each shim stack is at the correct height

by measuring distance (K) [top of shim stack (L)

to dock floor]. Distance (K) must equal the dock

leveler height (A).

INSTALLATION

The dock leveler is heavy. Use chains and a

lifting device with the appropriate lifting capacity

and reach. Failure to do so may result in damage

to dock leveler and/or serious personal injury or

death.

IMPORTANT

The minimum size of the shim that contacts the

leveler frame (i.e., the top shim of each shim stack)

must be at least 4-1/2 x 4-1/2 in. (114.3 x 114.3 mm)

to support the full width of the hoist cylinder / storage

prop weldment.

Use the thickest shim stock possible for stability and

weld penetration purposes. DO NOT use multiple

layers of 1/8 in. (3.18 mm) or thinner shim stock.

Advertising