Electronics International MVP-50T User Manual

Page 6

Advertising
background image

Contents

(Page 1 of 2)

Warranty/Agreement----------------------------------------------------------------------------------- 1

1.0 System Overview ----------------------------------------------------------------------------------- 3

1.1 System Description --------------------------------------------------------------------------- 5

1.1 MVP Display ----------------------------------------------------------------------------- 5
1.2 EDC-33T --------------------------------------------------------------------------------- 5
1.3 Probes, Transducers and Modules --------------------------------------------------- 5
1.4 Wiring & Extension Cables ----------------------------------------------------------- 6

1.2 Operational Overview ------------------------------------------------------------------------ 6

1.3 Installation Overview ------------------------------------------------------------------------- 6

1.4 Password Protection ---------------------------------------------------------------------------- 7

1.4.1 Level #1 Password (Maintenance): ------------------------------------------------ 7
1.4.2 Level #2 Password (OEM): --------------------------------------------------------- 8

2.0 Hardware Installation ----------------------------------------------------------------------------- 9

2.1 Important Information and Initial Check Out: ------------------------------------------- 11
2.2 Review the "EDC Wiring Work Sheets:" ------------------------------------------------- 12
2.3 Verify you have all the necessary Probes, Modules, Transducers and Cables: ---- 12
2.4 Install the MVP Display: -------------------------------------------------------------------

12

2.5 Install the Temperature Probes: ------------------------------------------------------------ 13
2.6 Install the Pressure Transducers: ----------------------------------------------------------- 14
2.7 Install the Interface Circuit for Annuciators --------------------------------------------- 16
2.8 Install the Interface Circuit for Flaps and Trim ------------------------------------------ 17
2.9 Install the Interface Circuit for the Gear Position, Unsafe Indicator and Gear.. --- 17
2.10 Install the CO-Gaurdian CO Detector -------------------------------------------------- 18
2.11 Install the Shunt: ----------------------------------------------------------------------------- 18
2.12 Install the Fuel Flow Transducer: -------------------------------------------------------- 19
2.13 Install the P-300C Fuel Level Probes ---------------------------------------------------- 20
2.14 Install the P-300M Magnetic Fuel Level Sender --------------------------------------- 20
2.15 Install the Resistive Fuel Level Module (RFLM-4-X): ------------------------------- 21
2.16 Install the Voice Alarm Control Panel (AV-17CP): ----------------------------------- 21
2.17 Install the Intensity Control Pot (CP-1): ------------------------------------------------- 21
2.18 Install the Master Warning (red) and Caution (yellow) Lights ---------------------- 22
2.19 Install the EDC-33T: ------------------------------------------------------------------------ 22

3.0 Install the EDC Wire Harnesses and Route Wires --------------------------------------- 23

3.1 Attach the three EDC 37-pin Wire Harnesses to the EDC --------------------------- 25
3.2 Connect the EDC Harness to the Temperature Probes -------------------------------- 25
3.3 Connect the EDC Harness to the Pressure Transducers ------------------------------ 25
3.4 Connect the EDC Harness to the Shunt -------------------------------------------------- 26
3.5 Connect the EDC Harness to the Fuel Flow Transducer ------------------------------ 26

Advertising