A2.0 Appendix:

A second EDC (Engine Data Coverter) may be connected to the MVP-50 in order to increase the
number of analog input to over 60. The primary EDC must already be installed per the MVP-50
installation instructions. The secondary and the primary EDC's are identical units.

Connecting a Second EDC to the MVP

Primary EDC (Required)

Secondary EDC (Optional)

Pin 36 (Wht)

Pin 18 (Wht/Grn)

Pin 18 (Wht/Grn)

MVP-50

Pin 12

Pin 13

Pin 11

Top Connector

Top Connector

25-pin D-sub
Connector

Note: Do not connect the
white wire (pin 36) of this
EDC to the MVP.

1. Mount the Second EDC:

1. Mount the Second EDC:

1. Mount the Second EDC:

1. Mount the Second EDC:

1. Mount the Second EDC:

Mount the second EDC to the inside firewall or in an equipment bay under the aircraft instrument panel. Use
the holes in the bottom plate of the EDC to mount the unit. Be sure you will have enough room to connect the
three D-sub connector wire harnesses to the EDC.

2. Install the Transducers (Sold Separately):

2. Install the Transducers (Sold Separately):

2. Install the Transducers (Sold Separately):

2. Install the Transducers (Sold Separately):

2. Install the Transducers (Sold Separately):

Find an appropriate location for each of the transducers you are connecting, and mount them following the
MVP-50 installation instructions.

3. Install the EDC Wire Harness and Route the Transducer Extension Wires:

3. Install the EDC Wire Harness and Route the Transducer Extension Wires:

3. Install the EDC Wire Harness and Route the Transducer Extension Wires:

3. Install the EDC Wire Harness and Route the Transducer Extension Wires:

3. Install the EDC Wire Harness and Route the Transducer Extension Wires:

When routing the EDC wire harnesses refer to the Top, Middle and Bottom "EDC Wiring Work Sheets" found
at the back of the MVP Installation Instruction Manual. The pin designations for the wiring harnesses on the
secondary EDC are exactly the same as on the primary EDC. Follow the MVP-50 installation instructions
when connecting the wires from the secondary EDC wire harness to any transducers. Tie wrap all wires so

Tie wrap all wires so

Tie wrap all wires so

Tie wrap all wires so

Tie wrap all wires so

they do not obstruct the freedom of travel of any controls.

they do not obstruct the freedom of travel of any controls.

they do not obstruct the freedom of travel of any controls.

they do not obstruct the freedom of travel of any controls.

they do not obstruct the freedom of travel of any controls.

4. Route the Power and Ground Wires to the Secondary EDC Wiring Harness:

4. Route the Power and Ground Wires to the Secondary EDC Wiring Harness:

4. Route the Power and Ground Wires to the Secondary EDC Wiring Harness:

4. Route the Power and Ground Wires to the Secondary EDC Wiring Harness:

4. Route the Power and Ground Wires to the Secondary EDC Wiring Harness:

Route the power wire (Top Connector, pin 37, Red Wire) to the MVP/EDC 5-amp circuit breaker. Route the
ground wire (Top Connector, pin19, Black Wire) to the aircraft ground. Tie wrap all wires so they do not

Tie wrap all wires so they do not

Tie wrap all wires so they do not

Tie wrap all wires so they do not

Tie wrap all wires so they do not

obstruct the freedom of travel of any controls.

obstruct the freedom of travel of any controls.

obstruct the freedom of travel of any controls.

obstruct the freedom of travel of any controls.

obstruct the freedom of travel of any controls.

5. Route the EDC RS422 Wire to the MVP Connector:

5. Route the EDC RS422 Wire to the MVP Connector:

5. Route the EDC RS422 Wire to the MVP Connector:

5. Route the EDC RS422 Wire to the MVP Connector:

5. Route the EDC RS422 Wire to the MVP Connector:

Route the secondary EDC RS422+A Pin 18 white/green wire to pin 11 (Port3, RS232In) of the MVP 25-pin D-
sub connector. Do not connect the secondary EDC RS422-B white wire to the MVP.