Operation

High Flow Applications (1000 to 5000 ml/min)

Setup

Install battery (see Installing the Battery Pack on page
16
). For optimum charge, ensure pump is not running.
Charge the battery by connecting the charger plug to
the sampler charging jack (Figure 1, #15). Ensure that
the battery is fully charged before sampling.

Aft er charging the batt ery pack, it is good practice to run the
pump for approximately fi ve minutes before calibrating. This
ensures the battery is in more steady-state conditions and
improves the agreement in pre and post-sampling calibrations.

Do not charge or operate pump from charger in hazardous locations.
Use only SKC-approved charger designated for this model to ensure

reliable performance. Failure to do so voids any warranty.

Ensure proper orientation of charging cable before plugging it into the

charging jack. Improper orientation/contact will short-circuit the battery

and voids any warranty.

Short-circuiting the battery pack will render it immediately inoperative.

Failure to follow warnings and cautions voids any warranty.

The battery pack may be kept on the SKC-approved charger for an indefi nite

time.

6

5

4

3

2

1

FLOW

ADJ

ON

AIRCHEK SAMPLER

MODEL 224-44XR

UL

¨

LISTED 124U

11

TOP

FRONT

BACK

15

1

4

5

13

13

AIRCHEK

SAMPLER

12

1 On/Off

switch

4 Flow adjustment screw
5 Accessory mounting screws (2)
6 Intake

fi lter housing

11 Cap screw to regulator
12 Cap screw to air discharge port
13 Battery pack screws (2)
15 Charging jack

Figure 1

Front, back, and top views of 44XR Sampler