3.12 Preoperational Checks and Trial Operation

3.12.1



Check for the availability of required operating air pressure of between 60 PSI to

90 PSI at the hoist's inlet port before trying to operate the hoist.

3.12.2



Verify that the load chain is not twisted or tangled and that the bottom hook is not

capsized prior to operating the hoist. Correct all chain irregularities before conducting the first hoist
operation. See

Figures 3-6

and

3-7

.

Figure 3-6

Twist in Load Chain

Figure 3-7

Capsized Hook and Chain

3.12.3



Confirm the adequacy of the rated capacity for all slings, chains, wire ropes and all

other lifting attachments before use. Inspect all load suspension members for damage prior to use and
replace or repair all damaged parts.