7.4

Pendant

7.4.1

The following procedure covers the installation of a pendant control station.

1) Put hose, 3 tubes and wire through the bracket hole. See

Figure 7-5

.

2) Attach the hose to the bracket by installing the retaining nut to the hose fitting.

3) Torque retaining nut to 20 lbf.-ft.

Figure 7-5

4) Attach the wire cable to the hoist valve body with the screw as shown in

Figure 7-6

.

5) Torque machine screw to between 30 and 40 in-lbf.

Figure 7-6

6)

Attach the three tubes to each nipple as shown in

Figure 7-7

. Red tube for main air, clear tube for

lifting and black tube for lowering.

Versions 1 & A

Versions B & C

Figure 7-7



When attaching tubes take care not to bend or kink tubing. This will result in the air flow

being restricted and poor response to the pendant controls.