IAI America RCP4-RA6R User Manual

Page 50

Advertising
background image

2. Installation

44

[6] Attachment of Work Part (Transported Object)

Utilize the threaded part on the rod tip to attach the work part (transported object). In the installation process,

make sure to hold 2 faces on the tip with a wrench so the tightening torque would not be applied to the rod.

[7] Mounting䎃Surface䎃

x

The platform to install the actuator should possess a structure that ensures enough stiffness, and should be

free from vibration.

x

The surface where the actuator will be mounted should be a machined surface or that with an accuracy

equivalent to it, and the flatness should be 0.05mm/m or below.

x

Ensure a room for maintenance work.

x

The side and bottom surfaces of the base on the actuator work as the datum surfaces for the side of the rod.

x

Use these surfaces as the datum surfaces for mounting.

Follow the diagram below when installing the device using the reference surface.

Model Name A Dimensions [mm]

RA5/6

2 to 4 or less

Datum Surface

Datum Surface

R0.3 or less

Advertising
This manual is related to the following products: