Wiring – Proface APL3000B - Node Box PC User Manual

Page 19

Advertising
background image

19

2.

Installation/uninstallation of the
front module and the control box
(PL-3600K/3700*/3900T Series)

Uninstalling

(1) Unscrew the two attachment screws to

detach the cover for the flexible cable.

(2) Disconnect the flexible cable.

(3) Remove four screws on the installation fas-

teners for the control box.

(4) Slide the control box in direction shown

by the arrow.

(5) Lift the control box and remove the front

module tabs from the slot on the
installation fasteners for the control box.
Then remove the control box.

Installing

Install the control box to the front module
in the reverse order of the uninstallation
steps. The necessary torque is 0.5N•m to
0.6N•m in every step.

Wiring

• To avoid an electric shock, prior to con-

necting the PL unit’s power cord terminals
to the power terminal block, confirm that
the PL unit’s power supply is completely
turned OFF, via a breaker, or similar unit.

• Any other power level can damage

both the PL and the power supply.

• Since DC type has no power ON/OFF

switch, be sure to attach a breaker-
type switch to its power cord.

• When the FG terminal is connected, be

sure the wire is grounded.

Flexible Cable
Cover

Flexible Cable

Use the bridge
position as a guide.

Advertising