3-6

3.1.6

Probe Insertion Hole

Includes those analyzers equipped with a probe supporter and probe protector.

When preparing the probe insertion hole, the following should be taken into consider-
ation:

CAUTION

• The outside dimension of detector may vary depending on its options. Use a pipe that

is large enough for the detector. Refer to Figure 3.4 for the dimensions.

• If the detector is mounted horizontally, the calibration gas inlet and reference gas inlet

should face downwards.

• The sensor (zirconia cell) at the probe tip may deteriorate due to thermal shock if

water drops are allowed to fall on it, as it is always at high temperature.

(1) Do not mount the probe with the tip higher than the probe base.
(2) The detector probe should be mounted at right angles to the measurement gas flow or

the probe tip should point downstream.

100 mm

100 mm

F3.04E.EPS

(vertical)

Bounds of the probe
insertion hole location

Flange matches
the detector size

(horizontal)

Type

Outside diameter of detector

Standard

52 mm in diameter

With probe protector 60.5 mm in diameter

Four-hole flange Eight-hole flange

*1

*1

Figure 3.4 Example of forming probe insertion hole