3. If pressure measurements above and below atmospheric pressure are required, connect a VACUUM

PUMP to the VACUUM/VENT port (2) as shown in Figure 2-1 on page 3.

4. Open the VENT valve (2), close the INPUT valve (1) and apply power to the vacuum pump and allow it

to evacuate the system for several minutes or until the digital display reading reaches equilibrium near
0 PSIA.

5. With the vacuum pump still running, close the VENT valve (2) and check for system leaks. If there are

none, continue to step 5.1.

a) To apply pressure, close the VENT valve (2) by turning clockwise approximately two turns to its

stop and open the INPUT valve (1) by turning counter-clockwise approximately 1/2 turn until the

numerical display begins to move. In general, the pressure may be changed rapidly until reaching

approximately 90% of it desired final value.

b) Use either the INPUT (1) or VENT valve (2) to obtain a specific pressure reading. Both provide

precise control. As the pressure approaches the desired value, the valve being used for control should

be rotated slowly clockwise to its closed position. With a little experience, pressure values very close

to the desired final value may be quickly achieved.

c) To obtain exact pressure readings, slowly rotate the VERNIER control (10) knob in the direction

required (clockwise to increase pressure) as indicated by the electronic numerical display.

Figure 3-1. Pressure Measurement Sequence

DUT

TARE

ZERO

DISPLAY

YES

ENTER

PRINT

CE

PSI

NO

P Gage Abs

VENT

TEST PORT

MONITOR

PRESSURE LIMIT

VERNIER

CONTROL

INPUT

POWER

DECREASE

INCREASE

7

8

9

4

5

6

1

2

3

10

Advertising