RIKON Power Tools 25-200 User Manual

Page 8

Advertising
background image

3.4.3 Cutterhead guard - INSTALLATION

- Take off both of the hex socket screws (A, Fig.8). Install the
cutterhead guard assembly (B, Fig.8) using two of hex socket
screws. Make sure the square washer (C, Fig. 8) stay between
the table and cutterhead guard.

FIG. 8

A

B

C

3.5 ELECTRICAL CONNECTION

Electrical installation should be carried out by competent, qualified personnel.

The connection should be made using the terminal box.

Ensure that the electrical supply corresponds with that of the machine, use cables of a section suitable for the power of the motor. For

an electrical supply of 230 V or a power rating greater than 15 A it will be necessary to increase the section of the connecting cables .

Connect the phase wires to the terminals R- S - T (L1 - L2 - L3) and the earth wire to the earth terminal.

On initial start-up check the direction of rotation, if it is incorrect then invert the two phase wires (for machines with 3 phase supply).

Direction of rotation of machines with single-phase supply is pre-determined during production .

On completion of the installation check that the terminal box is closed correctly and that the plug points are locked.

PT310 Single phase

PT310 Three phase

8

Advertising