Chapter 3 installation and configuration – Edwards Signaling ReadySet User Manual

Page 19

Advertising
background image

ReadySET Aspirating Smoke Detection System Installers Handbook

11

Chapter 3

Installation and configuration

Summary

This chapter provides information necessary to install the ReadySET detector system.

Content

Introduction 12

 

Antistatic precautions 12

 

System design 13

 

Sample pipe networks 14

 

Air handling unit installation 15

 

Below/above the ceiling installation 15

 

Return air duct sampling method 17

 

Return air grill sampling method 18

 

Installation 19

 

Installation guidelines 19

 

Removing the front cover 20

 

Mechanical installation 21

 

Electrical installation 21

 

Configuration 25

 

Final installation 28

 

Removing the detector 28

 

Advertising