Mounting/installation, Ann-rly board layout and connection to facp – Fire-Lite MRP-2001C PRE-ACTION/DELUGE CONTROL PANEL User Manual

Page 46

Advertising
background image

46

MRP-2001 Series Manual — P/N 53040:D 12/15/2010

Installation

ANN-BUS Devices

Mounting/Installation

The ANN-RLY relay module can be mounted inside the FACP main circuit board chassis. An
optional ANN-MBRLY mounting bracket allows mounting of the ANN-RLY in the lower right
hand corner of the FACP cabinet instead of or in conjunction with the mounting provisions under
the main FACP circuit board chassis. Refer to the documentation supplied with the module for
information on installation.

ANN-RLY Board Layout and Connection to FACP

Figure 2.23 illustrates the ANN-RLY board showing locations of screw terminals for connection to
the FACP and the DIP switches for selecting the ANN-BUS ID number.

Figure 2.24 ANN-RLY Board Layout and Connection to FACP

FACP

ANN-RLY

Primary ANN-BUS

+24 VDC

-24 VDC

ANN-BUS (ID#)
Address DIP switch

Advertising
This manual is related to the following products: