KYORITSU 6201 User Manual

Page 18

Advertising
background image

16

6.2 Double Insulation Test

The Class 2 appliances have the indication of "DOUBLE INSULATION"
or the symbol of

F

. Double insulation test is to check the insulation

resistance of the appliances is within the range defined in the standards.

(1) Power on the DUT
(2) Connect Test Lead M-7129 to Rpe terminal and clip the metal part

of DUT with alligator clip.

(3) Connect the mains plug of Safety class 2 DUT to test socket on the

instrument.

(4) Press the

START

switch when above preparation is completed.

(5) Measure the insulation resistance.

When it passes(1M

Ω

or more), lights up in green and

the test is completed. The measured value, which is passed the test, will be
displayed on the LCD .

Fig.13

Insulation

Advertising