Appendix a - wire selection tables – Spectrex 20/20L (LB) - UV/IR Flame Detector User Manual

Page 47

Advertising
background image

Spectrex Inc. - SharpEye

TM

UV/IR Flame Detector Manual – TM20/20LB Rev E, August 2004

39

Appendix A - Wire Selection Tables


G

ENERAL

I

NSTRUCTION FOR

E

LECTRICAL

W

IRING

:

1. Refer to Table 10 to determine the required wire gauge for general wiring,

such as relay wiring. Calculate the permitted voltage fall with respect to loads
current, wire gauge, length of wires.

2. Refer to Table 11 to select wire gauge for detectors power supply wires. DO

NOT connect any device or load to detectors supply inputs.

Table 10. Maximum DC resistance at 68°F for copper wire

AWG

mm

2

Ohm per

100 ft.

Ohm per

100 meter

26

0.12 - 0.15

4.32

14.15

24

0.16 - 0.24

3.42

11.22

22

0.30 - 0.38

1.71

5.60

20

0.51 - 0.61

1.07

3.50

18

0.81 - 0.96

0.67

2.20

16

1.22 - 1.43

0.43

1.40

14

1.94 - 2.28

0.27

0.88

12

3.09 - 3.40

0.17

0.55

10

4.56 - 6.64

0.11

0.35


Wiring Gauge
1 Select “No. of detectors” connected on one circuit.
2 Select “wiring length” per your installation requirements.
3 Refer to “Power Supply Range” for voltage extreme applied.

Table 11. Wiring length in feet (meter)

No. of
Detectors

Recommended Wire Diameter

Power Supply
Range (VDC)

24

18

16

14

-

-

22-32

20

18

16

14

-

-

22-32

16

20

18 16 14 -

22-32

12

20

18 16 14 -

20-32

8

20

18 16 14 -

20-32

4 and less

20

18

16

16

14

20-32

Feet

164

328 492 656 820

(meter)

(50)

(100) (150) (200) (250)

Max. Length from Power Supply to Last

Detector

Advertising