2 operating structure 17, 3 behaviour after supply voltage switch-on 17, Operating structure 17 – West Control Solutions SG 45 User Manual

Page 17: 5 operation

Advertising
background image

.

5

Operation

5.1

Front view

1 Line 1: process value display
2 Line 2: display of unit / extended operating level / error list /

Conf and PArA level values

3

Tare / sample & hold activated

4 Error list (2 x ô ), e.g.

· Fbf. x

sensor fault INP. X

· Pol. x

wrong polarity INP. X

· Lim. x

limit value alarm

· ...

5 Increment key / "slave pointer", maximum value
6 Enter key to select extended operating level or error list

Parameter-, Konfigurations-, Installations-Ebene

7 Status indicator LEDs

· green:

limit value 1 OK

· green blinking:

no data exchange with bus coupler
(only on instruments with optional

system interface)

· red:

limit value 1 active

· red blinking:

instrument fault, configuration mistake

8 Display elements, active as bars
9 Status of switching output OUT1 active
0 Status of switching output OUT2 active
! Decrement key/ "slave pointer", minimum value
§ PC connection for the BlueControl

Ò

engineering tool

g

In the first LCD-display line the measured value is shown. The second LCD-line normally shows the
setpoint. When changing over to the parameter setting, configuration or calibration level and at the
extended operating level, the parameter name and value are displayed alternately.

+

§ : To facilitate withdrawal of the PC connector from the instrument, please, press the cable left.

Operation

17

Front view

SG 45

+SENSE-

+ INP -

EX+

EX-

2

kg

SG

Advertising