Refrigeration connections, Pipe sizing guide, Pipework installation – Airedale Ultima Compact Condensing Unit 30kW - 450kW User Manual

Page 18: Ultima compact condensing units, Installation data

Advertising
background image

ULTIMA COMPACT

Condensing Units

18

Condensers & Condensing Units

Installation & Maintenance : 6259675 IM V1.4.0 10/2013

Installation Data

REFRIGERATION CONNECTIONS

UCCU30SQ-1/1 UCCU40SQ-1/1 UCCU50SQ-2/1 UCCU60SQ-2/1 UCCU70SQ-2/1 UCCU80SQ-2/1

Connections - Single
Circuit

(1)

Liquid Line

in

7/8

7/8

7/8

1 1/8

1 1/8

1 1/8

Suction Line

in

1 3/8

1 3/8

1 5/8

1 5/8

1 5/8

1 5/8

UCCU30DQ-1/1 UCCU40DQ-1/1 UCCU50DQ-2/1 UCCU60DQ-2/1 UCCU70DQ-2/1 UCCU80DQ-2/1

Connections - Dual Circuit

(1)

Liquid Line

in

3/4

3/4

3/4

7/8 / 3/4

7/8

7/8

Suction Line

in

1 1/8

1 1/8

1 1/8

1 3/8 / 1 1/8

1 3/8

1 3/8

UCCU75D-2/1 UCCU100D-2/1 UCCU110D-4/2 UCCU125D-3/1 UCCU130D-4/2 UCCU150D-3/1

Connections

(1)

Liquid Line

in

1 1/8

1 1/8

1 1/8

1 1/8

1 1/8

1 1/8

Suction Line

in

1 3/8

1 3/8

1 5/8

1 5/8

1 5/8

1 5/8

UCCU160D-4/2 UCCU180D-6/2 UCCU200D-6/2 UCCU225D-6/2 UCCU240D-8/2

UCCU250D-6/2

Connections

(1)

Liquid Line

in

1 1/8

1 1/8

1 3/8

1 3/8

1 5/8

1 3/8

Suction Line

in

2 1/8

2 1/8

2 1/8

2 1/8

2 5/8

2 1/8

UCCU270D-8/2 UCCU300D-8/2

UCCU330D-10/2

UCCU360D-10/2

UCCU400D-12/2 UCCU450D-12/2

Connections

(1)

Liquid Line

in

1 5/8

1 5/8

1 5/8 / 2 1/8

2 1/8

2 1/8

2 1/8

Suction Line

in

2 5/8

2 5/8

2 5/8

2 5/8

2 5/8 / 3 1/8

3 1/8

(1) Suitable For Brazed Connections.

PIPE SIZING GUIDE

Pipework sizes and routes should be set in accordance with good refrigeration practice.

PIPEWORK
INSTALLATION

The suction line should be insulated.

Liquid lines should be insulated in areas of high temperature or when exposed to
direct sunlight.

Special consideration should be given to vertical pipe runs and heat pump installation.

Unit performance will reduce if there are vertical rises of above 5m. Please consult
Airedale Service for risers above 10m.

When insulating refrigerant lines, cut approximately 30 - 50cm longer than the distance
between the units to ensure the insulation goes right upto the unit. Leave connections
uncovered for leak testing.

Remove burrs to the ends of the copper tube, holding the tube downward to avoid
allowing dirt to contaminate the tube.

Where applicable insert flare nuts removed from the pipework terminations and make a
flare at the end of the copper tube to conform with the following:

Inside surface is glossy and smooth

Tapered sides are of uniform length

Refrigeration lubrication is applied to mating surfaces

The installation of a sight glass close to the indoor unit is recommended.

Where applicable braze incoming pipe to rotalock service valve.