Compressor maintenance, Shut down periods, Condensing units ultima compact – Airedale Ultima Compact Condensing Unit 30kW - 450kW User Manual

Page 35: Chill ers, Maintenance

Advertising
background image

Condensing Units

ULTIMA COMPACT

Condensers & Condensing Units

35

Installation & Maintenance : 6259675 IM V1.4.0 10/2013

Chill

ers

ULT

IM
A CO

M

PACT

Maintenance

GENERAL MAINTENANCE (CONT.)

12 MONTHS

ACTION

NOTES

Repeat 3 month checks plus the following:

SYSTEM

Check safety devices cut out the compressor at the
correct settings.

REFRIGERATION Leak test all R407C joints and inspect all

water connections.

Rectify as necessary.

Check superheats with system running on full load
(the height of summer is recommended). Recheck
the charge following major adjustment of
the superheats.

Adjust as necessary. A period of 30
minutes should be allowed between each
resetting of the valve to allow pressures
to stabilise. Thermostatic expansion valve
only.

ELECTRICAL

Tighten all electrical terminals.

COMPRESSOR
MAINTENANCE

Periodic maintenance and inspection of this equipment is necessary to prevent premature
failure, the following periodic inspections should be carried out by period or hourly use
which ever is sooner.

1 Year

Measure compressor motor insulation.

7,500 Hours or 4 Years

Inspect compressor oil.

SHUT DOWN PERIODS

For periods of winter shut down the following precautions are recommended:

Close the liquid and discharge ball valve

Cap service ports

Turn off electrical circuits

Advertising