Installation Manual

8 . Remove the cap from the M12 receptacle on the bottom of the gateway transceiver . The cap should be saved so it

can be replaced if the power cable is removed later .

Figure 25: Bottom of gateway transceiver

9 . Connect the M12 plug connector assembly to the M12 receptacle and tighten the locking ring in a clockwise

direction until finger tight .

10 . Connect the 308 connector on the other end of the power cable to the 308 connector of the AC-to-DC power supply

and snap the anti-tamper collar over the connection .

11 . Connect the power cord to the power supply and then plug the three-prong male end of the power cord into a

120V AC power source . The LED indicator above the M12 connection turns on with a steady green light, indicating

the gateway power is on (Figure 26) .

NOTE:

N

A red blinking light indicates the gateway is being powered only by the internal backup battery .

No light indicates the gateway is not receiving power .

Figure 26: Powered gateway

The M12 connection is complete .

M12 Receptacle
with Cap Removed

RJ45 Receptacle

Steady green light
indicates gateway
power is on (not on
backup power)