1-1. hold point plotting, Hold point plotting, X-axis and y-axis on the graph plotting screen – FUTEK IPM600 (D610) Digital Display User Manual

Page 82

Advertising
background image

9.WAVEFORM DISPLAY

71

9-1-1. Hold Point Plotting

By using the hold function and the graph plotting function together, the held point (red)

can be plotted.

9-1-2. X-axis and Y-axis on the Graph Plotting Screen

X-axis

The X-axis is a time setting axis. One graph screen is plotted between the start signal

input point and the X start point.

There are 200 plotting points, and typical values for the predetermined time divided by

this number of plotting points are plotted.

Y-axis

The Y-axis is a load setting value. A graph is plotted between the Y start point and the Y

end point. (There are 100 plotting points.)

Held

point

Example) Relative maximum hold

Plotting Range

D Z

100

Y

X

200

X End Point

Y End Point

Y Start Point

0

Advertising