For rooftop terminations, Installation installation manual – Takagi T-H3M-IN/OS User Manual

Page 19

Advertising
background image

19

Page

Installation

Installation Manual

<For rooftop terminations>

Exhaust and/or direct-vent sidewall terminations should

be at least 2 ft (610 mm) away from an opposite surface/

wall Do not place the termination directly in front of an

opening into a building



Intake air

Exhaust gas

3 ft (914 mm) min.

B

A

2 ft (610 mm) min.

Intake air

B

B

A

Exhaust

Gas

A:Exhaust terminations must be at least 1 ft

 (305 mm) away from any obstructions

B:Intake terminations must be at least 1 ft

 (305 mm) away from any obstructions

Exhaust

termination

2 ft (610 mm)

min

Please follow all local and national codes in regards to proper termination

clearances In the absence of such codes, the clearances above can be used as

guidelines Local codes supersede these guidelines

CAUTION

Advertising