Power verification and addressing – HP Array Controller HSG V8.7 Software User Manual

Page 101

Advertising
background image

Power Verification and Addressing

UltraSCSI RAID Enclosure 4–15

3.

Pull the PVA extractor latches outward. Push the PVA into the slot
until the extractor latches engage the enclosure, then push the
extractor latches inward to seat and secure the PVA.

4.

Ensure that the PVA SCSI ID switch is set to the valid number for the
enclosure:

Master enclosure — 0

First expansion enclosure — 2

Second expansion enclosure — 3

5.

If there are no expansion enclosures, go to step 6.

If there are expansion
enclosures, turn O

N

all the ac

input boxes for each
expansion enclosure by
pressing I on each ac power
switch (C

ALLOUT

1).

6.

Turn O

N

all the ac input

boxes for the master
enclosure by pressing I on
each ac power switch
(C

ALLOUT

1).

7.

After the array controller is operational, verify that the subsystem is
functioning properly.

Table 4–7

Installing a PVA (Continued)

1

0

CXO5488B

2

1

Advertising