Installing hardware options, Installing servers – HP 60-Modular-Smart-Array User Manual

Page 19

Advertising
background image

Setup 19

If you are installing the storage enclosure into a telco rack, order the appropriate option kit at the

RackSolutions website (

http://www.racksolutions.com/hp

). Follow the storage enclosure-specific

instructions on the website to install the rack brackets.
Use the following information when connecting peripheral cables and power cords to the storage

enclosure.

Item Description
1

Power supply 1

2

Fan module 1

3

Dual 7-segment display board (for box ID numbering)

4

SAS in connector

5

SAS out connector

6

I/O module bay

7

For future use

8

Fan module 2

9

Power supply 2

Installing hardware options

Install any hardware options before initializing the storage enclosure. For options installation information,

refer to the option documentation. For storage enclosure-specific information, refer to "Hardware Options

Installation (on page

23

)."

Installing servers

Install the servers in the rack directly above the storage enclosure. Refer to the server documentation.

NOTE: When installing servers, HP recommends installing all storage enclosures at the bottom of the rack.

To optimize cabling access, avoid interleaving the storage enclosure and server products.

Advertising