Summers Superchisel - 5-Section User Manual

Page 27

Advertising
background image

2-15

SECTION 2 – SET-UP OF PART 2 WING

NOTE: Drawing for steps 12 through 21 is on previous page.
12. Attach 11L x 15 wheels onto hubs with 9/16” wheel bolts (torque required: 122 ft-lbs).

NOTE: STEPS 14 THROUGH 18 MAY HAVE BEEN PRE-ASSEMBLED AT FACTORY.

13. Install gauge wheel support (8T4090) onto wing with 7/8” x 2-1/2” bolts.
14. Apply anti-seize to jack bolt (8T6000) threads. Screw jack bolt into axle holder (8T4094) far

enough to see hole on bottom of bolt through hole in axle holder.

– Insert 3/16” x 2” roll pin. Insert pin far enough so it will clear tube when rotated.

15. Place gauge wheel depth decal on axle holder.

– Locate decal 1” from bottom of 4x4 tube.

– Make sure that decal faces the front of the machine.

– Attach decal off to one side of axle holder to avoid seam on support tube.

16. Slide axle holder and jack bolt into gauge wheel support. Slide 1-1/4” flat washer onto bolt and

turn 1-1/4” slotted nut on.

– Do not tighten slotted nut.

17. Add gauge wheel screw top onto jack bolt.

– Insert 1/2” x 2-1/4” bolt into screw top and bolts. Secure with locknut.

18. Attach gauge wheel jack handle to screw top.

– Install 3/8” x 2” bolt in handle and screw top. Secure with locknut.

– Do not over tighten. Handle must pivot freely.

19. Check free operation of gauge wheel assembly.

– Loosen or tighten slotted nut for optimum performance of gauge wheel.

– Install 3/16” x 2” roll pin after slotted nut is adjusted properly.

20. Insert 8K1100 (6 bolt) axle and hub assembly into each receiver tube. Apply good quality anti-

seize to axles before installation. Retain axle into receiver tube with 1/2 x 3-3/4” bolt and

locknut.

21. Attach 11L x 15 wheel onto hub with 9/16” wheel bolts (torque required: 122 ft-lbs).

Advertising