Connecting/sequencing wing lift, Connecting and sequencing wing lift -28 – 2-30 – Summers Superchisel - 5-Section User Manual

Page 40

Advertising
background image

2-28

SECTION 2 – CONNECTING AND SEQUENCING WING LIFT

1. Charge wing lift cylinder system.

– Block rod end of cylinders up so that cylinder shafts can be extended without hitting any-

thing.

– Fully cycle cylinders several times to make sure that all air has been removed from the sys-

tem.

– Leave cylinders in fully extended position.

2. Connect rod end of 5 x 36” cylinders to part 1 wing.

– Install wing lift pin, rollers and washers onto the wing and cylinder rod tube. Secure pin with

8T3810 washer and roll pin.

– The 8L0250 1/4” thick washers must slide freely inside wing flamecuts.

– The drawing below shows an end view of this connection.

– Grease rod end tube on 5 x 36” cylinders before lifting wings. Also grease part 2 wing pivot

pins.

Advertising