Trip assemblies, Installation of trip assemblies -17 – 2-18 – Summers Superchisel - 5-Section User Manual

Page 29

Advertising
background image

2-17

SECTION 2 – INSTALLATION OF TRIP ASSEMBLIES

1. Hang trip assemblies according to layout.
NOTE: Installation of trip assemblies can be

done after machine is raised. Complete

hydraulic assembly on pages 2-19 through

2-30 before mounting trip assemblies if

preferred.

– Use 3/4” u-bolts for 4x4 tube with 3/4”

lock washers and 3/4” nuts.

– Tighten u-bolts an equal amount on

top and bottom. The same amount

of threads should appear on top and

bottom of the u-bolt.

2. Trip assemblies located at 270” on 50’-54’,

294” on 56’-60’ from center are attached

with 3/4” x 6-1/2” (8X0121) bolts. These

bolts also hold the liftarm pivot bracket at

that location.

3. Install shanks into trip assemblies.

– Slide shank into shank holder. Install

3/4” x 4” bolts and tighten securely.

– Shanks will fit snugly into shank holder.

If tapping bottom of shank does not

work, it may be necessary to remove

burrs or paint from shank or shank

holder.

Advertising