Field operation, Field operation -6 – 3-11 – Summers Superchisel - 5-Section User Manual

Page 50

Advertising
background image

3-6

SECTION 3 – CHISEL PLOW OPERATION

FIELD OPERATION

1. Always rephase cylinders before starting field operation.

2. Choose a flat spot in a field to set depth and level the chisel plow.

3. Determine desired tillage depth by working test strips within the field.

IMPORTANT!

The operator is responsible for adjusting the machine since machine does not come “Field

Ready” from the factory.

NOTE: Optimum performance of the machine is achieved by tilling at a depth and moving at

a speed that does not go beyond the limit of the trip assemblies. This limit is exceeded if the

connecting bolt (shown in the following drawing) continually rides above the trip assembly

cap.

Advertising