Maintenance, 1 every visit, at least monthly – Campbell Scientific CS420 and CS425 PDCR 1830-8388 Pressure Transducer User Manual

Page 24

Advertising
background image

CS420-L and CS425-L Pressure Transducers

6: End (P95)

; Deactivate Multiplexer

7: Do (P86)
1: 51

Set Port 1 Low


; Adjust sensor readings for multiplier and
; offset:

8: Scaling Array (A*Loc + B) (P53)
1: 1

Start

Loc

[DEPTH_FT]

2: 2.2975 A1

;Multiplier

#1

3: .36781 B1

;Offset

#1

4: 1.0560 A2

;Multiplier

#2

5: .4011

B2

;Offset

#2

6: 3.0001 A3

;Multiplier

#3

7: .2103

B3

;Offset

#3

8: 1.9821 A4

;Multiplier

#4

9: 1.0029 B4

;Offset

#4

; Record average depth every hour.

9: If Time is (P92)
1: 0000

Minutes (seconds --) into a

2: 60

Minute Interval (same units as above)

3: 10

Set output flag high (Flag 0)


10: Real Time (P77)
1: 110

Day,

Hour/Minute


11: Average (P71)
1: 4

Reps

2: 1

Loc

[DEPTH_FT]

9. Maintenance

Periodic evaluation of the desiccant is vital for keeping the vent tube dry. To
assess the effectiveness of the desiccant, use one of the following:

• An indicating desiccant that changes color when it’s losing its drying

power

• An enclosure humidity indicator such as our #6571 humidity indicator

card

9.1 Every Visit, At Least Monthly

• Collect data

• Visually inspect wiring and physical conditions

20

Advertising