Chapter 3, Required tools and supplies, Tools – Allied Telesis AT-iMG6x6MOD Electronics Unit User Manual

Page 11: Additional supplies, Check package contents, Installing the gateway in the enclosure, Required tools and supplies check package contents, Chapter 3 of th

Advertising
background image

AT-iMG646MOD Installation Guide

Chapter 3: Installing the Gateway in the Enclosure

11

Chapter 3

Installing the Gateway in the
Enclosure

This chapter describes how to install the gateway in the enclosure and assumes you have already installed the
enclosure. Refer to the (Enclosure installation Guide)

Required Tools and Supplies

The following tools and supplies are required to install the gateway:

Tools

Have the following tools on hand before you install the enclosure or gateway:

ˆ

Flat head and #2 Phillips screwdrivers

ˆ

Wire cutters

ˆ

5/32 in. hex-pin security screwdriver

Additional Supplies

You may also need the following supplies:

ˆ

Silicone sealant

ˆ

Two UV-rated wire ties

ˆ

Console cable

ˆ

Power cable (AT-iMG646MOD-C01) - or customer built

ˆ

Power supply (AT-iMG005G, AT-iMG006G)

ˆ

Fiber cleaning materials (see Appendix B, “Cleaning Fiber Optic Connectors” on page 39)

Check Package Contents

The following items are included in the electronics package. If any item is missing or damaged, contact your
Allied Telesis representative for assistance.

Advertising