The installation and initial operational check of the
Power Soak Skewer Wash must be performed by
licensed and certified plumbers and electricians.

Be sure to follow all applicable national and local
electrical codes when installing the electrical supply
and/or a new breaker. DO NOT connect the system
using a power cord and plug or an extension cord of
any kind.

Please refer to the detailed installation instructions that were sent with
the Power Soak Skewer Wash.

Electrical Requirements

The electrical requirements of the machine are on the serial number
plate located on the front of the wash sink, adjacent to the control panel
enclosure and inside the enclosure on the back face of the enclosure
door.

The machine is completely pre-wired and tested at the factory.

All Power Soak systems have a single point electrical connection, and a
dedicated circuit is required. A

“hard-wired” connection from an

appropriate power source junction box to the control panel is used to
power the machine. The junction box power source should be located
at the end of the machine nearest the motor. Ideally, the junction box
should be located on the wall directly behind the pump motor and
control panel.

The installer is to provide an electrical disconnect that should be
incorporated in the

“hard wire” electrical connection to the machine.

Properly sized watertight conduit, fittings and parts are required, as well
as the appropriate gauge wire.

A wiring diagram is located in the control panel enclosure on the
machine. Specific part numbers and part information can be obtained
from the factory by calling 800-444-9624.