7step-by-step directions, Ceiling supported – M&G DuraVent DuraPlus® User Manual

Page 7

Advertising
background image

7

STEP-BY-STEP DIRECTIONS

There are five general types of DuraPlus

installations:

1. Ceiling-supported

2. Roof-supported

3. Tee-supported (through the wall)

4. Masonry Fireplace

5. Zero-Clearance Fireplace

Review the step-by-step directions before

beginning your installation.

CEILING SUPPORTED

1. Place Appliance: Position the appliance

according to the manufacturer’s instructions.

The flue outlet collar should be placed

between the rafters or joists above, if possible.

2. Frame Support Opening: Drop a plumb

bob to the center of the appliance’s flue outlet

and mark this center point on the ceiling. Refer

to Table 2 for specific framing and clearance

dimensions. Mark appropriate cutting lines

around the center point. Cut a square hole in

the ceiling for a Square Support Box, or a round

hole for a Round Support Box. Frame a level,

square opening centered over the hole which

you have cut. (Figures 3 and 4).

Figure 3

Figure 4

ATTIC

MINIMUM OF 2 INCHES

BELOW FINISHED CEILING

18 INCHES MINIMUM FOR

SINGLE-WALL STOVEPIPE

CAP

SDP-C

STORM COLLAR

SDP-SC

FLASHING

VENTILATED

SDP-SC

CHIMNEY SECTIONS

SDP-P

ATTIC INSULATION SHIELD

SDP-IS

FRAMED

OPENING

SqUARE CEILING

SUPPORT BOx

SDP-SB OR

ROUND CEILING

SUPPORT SDP-RS

14 1/2”

FRAMING

SUPPORT BOx

jOISTS

2 INCHES MINIMUM

BELOW FiniShed

CEILING

14 1/2”

CEILING jOISTS

Advertising