AiM GSX-R 1000 User Manual

Page 12

Advertising
background image

MXL P&P SUZUKI GSX-R K3

User Manual

Release 1.07

www.aim-sportline.com

1 3

2.3 – Releasing the high beam and the front fairing screws.

The 3

rd

installation step is releasing the

high beam and the front fairing screws, to
install more easily the kit. These screws
are self threading Phillips.

In Figure 12 is highlighted one of the two
remaining screws of the fairing.

Note: in the Figure the screws has
already been removed.

Figure 12: front fairing and high beam screws

position

Once released these screws, pull (softly)
the front fairing onwards to fix the lateral
screws of the new dash (see Figures 28
e 30 for further information).

While pulling the fairing, pay attention not
to disconnect the high beam that may fall
down.

Note: to pull the fairing onwards, screws
and pins should have been removed.

Figure 13: front fairing and high beam screws

released.

1 4

2.4 – Removing the stock dash; unplugging the connectors

The fourth installation step is removing the
stock dash and unplugging the stock
connectors.

The stock dash is fixed to the bike in four
points: with two 5 mm hex screws in the
first two and through a bracket in the other
two.
Remove the hex screws highlighted in
Figure 14.

Figure 14

:

stock dash front screws position.

12

Advertising
This manual is related to the following products: