Step 7, Step 8 – Aladdin Light Lift ALL300-CM User Manual

Page 5

Advertising
background image

STEP 7

Position ALL300 where ceiling box will be centered in ceiling hole. Weight and bottom contact plate

assembly should hang down through ceiling hole. Adjustments can be made loosening 3/8” channel strut

bolts that hold ALL300 to channel struts. Retighten channel strut bolts after adjustments are made.

Confirm channel strut nuts are seated properly. See Diagram C.
Never adjust the channel struts improperly. This could cause the chandelier to fall, which could cause

death, personal injury, and/or property damage.

Conduit Coupler

Bottom Set Screw

3/32” Allen Wrench

STEP 8

Adjust ceiling box elevation up or down to be flush with sheetrock. Use 3/32” Allen wrench on conduit

coupler to loosen bottom set screw. Conduit assembly is telescopic. The ceiling box should not touch inside

of ceiling hole. Retighten bottom set screw on conduit coupler and confirm top set screw is tight. See

Diagram D.
Never attach or adjust the conduit assembly improperly. This could interfere with the automatic shutoff

system and could cause the chandelier to fall, which could cause death, personal injury, and/or property

damage.

Diagram C

3/8” Channel Strut

Adjustment Bolts

3/8” Channel Strut

Adjustment Bolts

Diagram D

4 1/2” Hole

Conduit Coupler

Top Set Screw

3/32” Allen

Wrench

Sheetrock

Sheetrock

Advertising
This manual is related to the following products: