Installation, Unpacking and handling, Location and clearance – BKI VGG-CO Rotisserie/Convection Oven Combination User Manual

Page 10: Wiring

Advertising
background image

Rotisserie/Convection Oven

Installation

8

Installation

Serious injury, equipment damage or death could result if attempting to install this oven
yourself. Ensure that an authorized BKI service agent install the oven.

“Risk of Electrical Shock – Appliance must be secured to building structure. Follow
tethering kit instructions for installation” (sold separately).

Unpacking and Handling

It is the owners’ responsibility to file all freight claims with the delivering truck line. Inspect all cartons and crates
for damage as soon as they arrive. If damage to cartons or crates is found, or if a shortage is found, note this on
the bill of lading (all copies) prior to signing.

If damage is found when the equipment is opened, immediately call the delivering truck line and follow up the call
with a written report indicating concealed damage to your shipment. Ask for an immediate inspection of your
concealed damage item. Packaging material MUST be retained to show the inspector from the truck line.

Remove all packing from the interior and exterior of the oven.

Location and Clearance

1. Place the unit not less than 8” from the back wall.

2. Lock the casters so the oven does not move. After every time the oven is moved, make sure the casters

are locked.

Wiring

Electrocution, equipment failure or property damage could result if an unlicensed
electrician performs the electrical installation. Ensure that a licensed electrician
perform the electrical installation.


The oven, when installed by an authorized BKI service agent, must be grounded in accordance with local codes,
or in the absence of local codes, with the National Electrical Code, ANSI NFPA 70-2002. You can obtain this code
from:

The National Fire Protection Association
Batterymarch Park
Quincy, MA 02269

Advertising