Installation – Environmental Express AutoBlock III User Manual

Page 8

Advertising
background image


INSTALLATION



Install Drain Line & Carboy


• Remove the ½” barb fitting from the

bag of parts supplied


• Remove the nut from the fitting

• Remove the cap from the carboy

• Place the fitting into the cap. The treaded portion

of the fitting needs to be on the inside of the cap.


• Place the washer & then nut onto the fitting & tighten.

• Place the cap back onto the carboy.

• The drain line is located on the right side towards the back of the unit. Place the supplied ½” tubing

onto the barb fitting and the other end to the carboy. Insure the tubing goes in a DOWNWARD
direction the entire length.


The system is designed for downward gravity flow throughout the entire length to the carboy.
Place the carboy under the AutoBlock.

carboy cap & bulkhead fitting










Electrical Box Installation

• Position the on/off switch to the off position.

• A 10’ power cord has been supplied.

Power requirements are standard 115VAC 12A US and Canada
Power requirements are standard 220VAC 6A International

Plug the power cord into the power module located in the back of the electrical box and into a
standard AC outlet

• Place the electronic box on the platform of the AutoBlock, left hand side of the unit. The mounting feet

will rest in the recessed holes.


• Connect the three cables from the electrical box to the AutoBlock system on the left side. JC1, JC2

and JC3 have been marked on the cable connector & on the AutoBlock.

on/off switch

OFF

ON

Congratulations


You have finished physically setting up the AutoBlock and are ready to move
onto a systems check and calibration. A systems check and calibration set up
must be done before any methods run.

ENVIRONMENTAL EXPRESS

For technical support call 1-800-745-8218 or send email to [email protected]

5528INSTALL rev 3

8

9/15/09

Advertising