Upflow installations top vent (see fig. 10), 359aa v – Bryant 4-WAY MULTIPOISE 359AAV User Manual

Page 18

Advertising
background image

18

IN
L

E

T

EXHAUST

IN

ON

OFF

VE

NT

AIR

FL

O

W

Street Elbow

1

/

2

CPVC

(Loose parts bag)

Casing Grommet
Black Rubber

5

/

8

ID

(Loose parts bag)

Drain Tee

Drain Connector Black PVC

3

/

4

PVC X

1

/

2

CPVC

(Loose parts bag)

Drain Line Vent Tee

3

/

4

PVC or

1

/

2

CPVC (Field supplied)

Drain Tube
Black Rubber

1

/

2

ID & Clamps

Drain Tube
Corrugated

5

/

8

ID

& Clamps

Relief Tube
Black Rubber

3

/

16

ID

Coupling & Clamps
(Optional)

25--24--80

Single Pressure
Switch

Dual Pressure Switch Detail

Drain Tube Black Rubber

5

/

8

ID & Clamps,

Cut length to fit (Loose parts bag)

On Some Models
ONLY

Plastic Caps (2)
Yellow or black

Vent Drain
& Clamps

Representative drawing only, some models may vary in appearance.

A07706

Fig. 10 -- Upflow Installations Top Vent

Upflow Installations Top Vent (See Fig.

10)

S

Remove knockout from the side of the furnace casing where
drain tube will exit.

S

Install casing grommet (black rubber

5

/

8

″ (16 mm) ID

grommet -- in loose parts bag)

S

Install the

1

/

2

″(13 mm) CPVC street elbow on discharge of trap

S

Install the black PVC tube connector (

3

/

4

″ (18 mm) PVC x

1

/

2

(13 mm) CPVC from loose parts bag) as shown in the
illustration above.

S

Cut the black drain tube (

5

/

8

″(16 mm) ID -- in loose parts bag)

to length to fit between trap and tube connector through
grommet.

S

Clamp both ends of the drain tube using clamps provided.

S

Glue the CPVC street elbow to the trap using appropriate
cleaner and solvent cement.

S

The field supplied

3

/

4

″ PVC or

1

/

2

″(13 mm) CPVC drain line

vent tee must vent outside the furnace cabinet (see exploded
view above).

NOTE: It is recommended that all PVC piping and fitting
connections be fit up and inspected before final cementing. Trap
must be primed before operation.
Verify all condensate drain
connections are securely clamped. A coupling and clamps (in
loose part bag) may be installed as shown for future servicing of
the vent system.
NOTE: “PVC” is used as a generic term. Pipe and fitting
materials used must be acceptable to the local code officials
having jurisdiction.

359AA

V

Advertising