Using exterior risers, Vent termination shielding – Bryant 4-WAY MULTIPOISE 359AAV User Manual

Page 29

Advertising
background image

29

EXHAUST

INLET

GRADE LEVEL

SNOW LEVEL

OR

8” (203.2mm)* MIN.

20’ (6.1m) MAX

*18 in. (457.2mm) Minimum for
cold climates [sustained 0

_F

(- 17

_C) and below for 24 or

more consecutive hours]

8” (203.2mm)

MIN.

12 ” (304.8mm)

MIN.

A07716

Fig. 22 -- Sidewall Termination with Exterior Risers to Get

Above Snow Level or Grade Level

Using Exterior Risers

1. Install elbows and pipe to form riser as shown in Fig. 22.
2. Secure vent pipe to wall with galvanized strap or other rust

resistant material to restrain pipe from moving.

3. Insulate pipe with Armaflex or equivalent moisture resist-

ant closed cell foam insulation or fiberglass insulation if

boxed in and sealed against moisture.

Vent Termination Shielding

Under certain wind conditions some building materials may be

affected by flue products expelled in close proximity to

unprotected surfaces. Sealing or shielding of the exposed surfaces

with a corrosion resistant material (such as aluminum sheeting)

may be required to prevent staining or deterioration. The

protective material should be attached and sealed (if necessary) to

the building before attaching the vent terminal.

OVERHANG

12 in. (304.8mm) MIN

.

12 in. (304.8mm) MIN. Ground
Level OR Snow Level

INLET

EXHAUST

90

°

Same Joist

Space

FRONT VIEW

SIDE VIEW

12 in. (304.8mm)

25- 23- 73

A07699

Fig. 23 -- Recommended Alternate Installation

for Sustained Cold Weather

(0_F & below for 24 or more consecutive hours)

25--00--06

A

A

B

A = 12

(304.8mm) Above roof or snow accumulation level

B = 8

(203.2mm) Min., 20(6.1m) Maximum, except in areas

with extreme cold temperatures [sustained 0

°F(--17°C) and

below for 24 or more consecutive hours], the 18

(457.2mm)

Min.

A07717

Fig. 24 -- Rooftop Termination

359AA

V

Advertising