Initial start-up procedure, Upward, Downward – Multiquip ST70 User Manual

Page 25: D. push the hopper remixer control lever, Figure 21. handheld receiver/ transmitter, Figure 22. handheld remote cable unit

Advertising
background image

ST-70 — PARTS & OPERATION MANUAL — REV. #4 (05/29/07) — PAGE 25

D. Push the Hopper Remixer Control lever

upward

(Figure

18) and observe that the blades (Figure 20) inside the
hopper are turning in a counter-clockwise direction
(reverse).

14. OPTIONAL RADIO REMOTE CONTROL

The MAYCO ST-70 Concrete Pump has a remote control feature
that allows the pump to be remotely controlled. If desired, the
pump can be operated via a receiver/transmitter method (Figure
21) or a hardwire method, which utilizes a 25-ft. extension cable.
The manual remote cord (Figure 22) should be installed under
the main control box. Contact your MAYCO representative for
further information.

C. Push the Hopper Remixer Control lever

downward

(Figure

19) and observe that the blades (Figure 20) inside the
hopper are turning in a clockwise direction (forward).

Figure 20.

Hopper Remixer

Blades (Rotation)

FORWARD

REVERSE

SHAFT ROTATION

BLADES

(CCW)

(CW)

INITIAL START-UP PROCEDURE

Figure 21.

Handheld Receiver/

Transmitter

REMTRON

REMTRON

ON

ON

OFF

OFF

A

B

HANDHELD

REMOTE CONTROL TRANSMITTER

REMOTE CONTROL TRANSMITTER

REMOTE CONTROL RECEIVER

REMOTE CONTROL RECEIVER

ANTENNA
INPUT

ANTENNA
INPUT

CONTROL SWITCHES

CONTROL SWITCHES

MOUNT ON MAYCO ST-45
FRAME BODY

MOUNT ON MAYCO ST-45
FRAME BODY

SIGNAL
CABLE

SIGNAL
CABLE

Figure 22.

Handheld Remote Cable Unit

HAND HELD
REMOTE UNIT

HAND HELD
REMOTE UNIT

CONTROL SWITCHES

CONTROL SWITCHES

25 FT. CABLE

25 FT. CABLE

15. CYLINDER LUBRICATION BOX

WARNING

Before checking lubricaton level, stop the
engine and remove the engine starter key. We
recommend using soluble type oil (water & oil
mixture). The oil level should be checked

everyday prior to pumping. The oil level should be maintained
at a height of 5 inches or about ´½ the concrete cylinder height.

Important Notice! During freezing temperature after pumping,
completely drain the water box and cover the hopper. Frozen
liquid will restrict the piston travel and cause severe damage to
the pump.

As the rubber piston cups naturally wear, fine cement particles
will accumulate in the box. Once the concrete paste reaches a
height of about ½ inch from the bottom. The box should be
drained and cleaned. To clean, remove the drain plug located
at the bottom of the box. Once the Box is drained, start the
engine and stroke the cylinder (keep hands out of box) ten to
fifteen times. While stroking, spray water inside of the box to
thoroughly clean out all contamination. When the box is clean,
replace drain plug, add new lubrication and install the top cover.

Any questions regarding the above mentioned procedure,
please call the Mayco Service Department: 1-800-30-MAYCO.

Advertising