Installation instructions continued, Step 4: install bowl assembly – Bradley Smoker MG-2/BIR3 User Manual

Page 9

Advertising
background image

9

Express® Lavatory System - MG Series with Battery Infrared Control

Installation Instructions

MG-2/BIR3

Bradley Corporation • 215-1510 Rev. D; ECN 07-815

8/23/07

Installation Instructions continued . . .

Step 4: Install bowl assembly

IMPORTANT: See Figure 4 below when installing the bowl assembly. If the fixture

has soap option, refer to the soap system installation manual
215-1585 before installing the bowl assembly.

1. With someone to assist you, place the bowl assembly squarely onto the frame being careful not

to pinch tubing between bowl and frame.

2. Attach the front of the bowl assembly to the frame using the two 1/4-20 x 1/2" pan-head

screws and washers provided. Do not tighten screws at this time.

IMPORTANT: When bolting the bowl assembly to the wall, do not overtighten the

bolts. Overtightening bolts can damage the Terreon® material.

3. After the bowl assembly is attached to the frame, install the two 3/8" bolts and washers

(supplied by the installer) to bolt the bowl to the wall anchors. Do not overtighten bolts.

4. Tighten the screws installed in procedure #2 above to secure the bowl assembly to the frame.

Do not overtighten.

5. If necessary, adjust sprayhead body to fit closely to wall by adjusting sprayhead mounting bolts.

See Figure 8 on page 13 for sprayhead mounting bolt locations.

Figure 4

3/8" BOLT
AND WASHER

TERREON®
END CAP (R)

TERREON®
END CAP (L)

FRAME

SPRAYHEAD

3/8" BOLT

AND WASHER

BOWL

1/4"-20 x 1/2"
PAN HEAD
SCREWS AND
WASHERS
(2) PLACES

BACK VIEW

Advertising