The first chart shows the output rate and good output rate of the machine over time if a
10% production loss is defined. Though the output rate of the machine is 100 units per
minute, the good output rate is only 90 units per minute because 10% of the product
produced by the machine is wastage. Of course, the machine produces nothing during the
failure from t

1

to t

2

.

The second chart shows the output rate and good output rate of the machine if, in addition
to a general 10% production loss, there are also units lost due to failures. At the end of the
failure at time t

2

, the machine immediately produces the quantity of Lost Units After

Failures. Then, the machine’s good output rate returns to 90 units per minute.

C

ONVEYOR

EXAMPLE

The chart below illustrates examples of both event- and production-based loss for an
accumulating conveyor. Suppose that the upstream basic machine is outputting good units
at a rate of 115 units per minute, the conveyor has a run speed (i.e., maximum transfer
rate) of 120 units per minute, and the downstream basic machine is running at 100 units
per minute. Suppose also that the conveyor has a 10% production loss, fails from time t

1

to

t

2

, and loses units when it fails.

Good Units

Lost Units

0

100

111

t

1

t

2

Good Units

Lost Units

Time

Rate

10% Production Loss & Lost Units After Failure

Total Output Rate of Conveyor

Good Output Rate of Conveyor
and Input Rate of Machine 2

Run Speed =
100 units/min

Basic

Machine 1

Basic

Machine 1

Conveyor

Conveyor

Basic

Machine 2

Basic

Machine 2

Run Speed = 120 units/min
Failure from t

1

to t

2

Good Output Rate =
115 units/min

120