Pmt installation, Hole and run a – Bully Dog 40300 PMT advanced vehicle downloader, controller, monitor and gauge User Manual
Page 23
Advertising
22
PMT INSTALLATION
Intr
odu
ctio
n
Par
ts D
escription
Op
era
ting
Ins
tru
ctio
ns
Inte
rne
t U
pda
tes
App
end
ix
pOsT-TURBO MOUNT
1. Find a location on the exhaust pipe that is 3-6”
downstream from the turbo charger output. Then
drill a
5
/
16
” hole and run a
1
/
8
” pipe tap into the hole.
Mount the Pyrometer Probe in the threaded hole
using a
9
/
16
” wrench to tighten the probe holder or
tube fitting to the down tube. Then tighten the
Pyro Probe Cap to the holder using a
5
/
8
” wrench.
2. Run the Pyro Cable along the brim of the engine
bay, and then let the end sit when installing the
PCH Board.
Dodge Post-turbo Mount
Securing pyro line
Pyro line secured
PM
T In
sta
llati
on
Advertising