Pmt installation, Hole and run a – Bully Dog 40300 PMT advanced vehicle downloader, controller, monitor and gauge User Manual

Page 23

Advertising
background image

22

PMT INSTALLATION

Intr

odu

ctio

n

Par

ts D

escription

Op

era

ting

Ins

tru

ctio

ns

Inte

rne

t U

pda

tes

App

end

ix

pOsT-TURBO MOUNT

1. Find a location on the exhaust pipe that is 3-6”

downstream from the turbo charger output. Then
drill a

5

/

16

” hole and run a

1

/

8

” pipe tap into the hole.

Mount the Pyrometer Probe in the threaded hole
using a

9

/

16

” wrench to tighten the probe holder or

tube fitting to the down tube. Then tighten the
Pyro Probe Cap to the holder using a

5

/

8

” wrench.

2. Run the Pyro Cable along the brim of the engine

bay, and then let the end sit when installing the
PCH Board.

Dodge Post-turbo Mount

Securing pyro line

Pyro line secured

PM

T In

sta

llati

on

Advertising