Power sources, Cable requirements, Figure 3 – ClearCube I/Port Users Guide User Manual

Page 18

Advertising
background image

8

Power Sources

To ensure regulatory compliance, use only the power supply included in the shipping
carton with the I/Port, or a ClearCube-approved equivalent.

Surge protectors for electrical devices are recommended in areas of frequent lightning.
However, when lightning is occurring, your equipment should be properly shut down and
unplugged from AC power until the storm has passed.

Be careful to not interrupt power while the I/Port is receiving a software update.

Cable Requirements

For I/Port installations, you need 16 CAT5 cables per chassis to connect the hosts to your
network switch. You will not need to connect any cables to the C/Port connections. With
I/Ports, the cables going to the desktop are connected directly to your network switch.

Figure 3

on this page provides schematics of the cabling required to connect your R–Series chassis to
I/Ports and your Ethernet network.

Figure 3. R–Series Chassis Cabling Diagram

Chassis

Data Center

User Desktops

with I/Ports

Network

Switch

Admin C/Port

and Terminal

Ethernet

Cables

Advertising
This manual is related to the following products: