Figure 18, When transporting the instrument – Metrohm 850 Professional IC Anion MSM-HC MCS Gradient User Manual

Page 48

Advertising
background image

3.10 High pressure pump

■■■■■■■■■■■■■■■■■■■■■■

38

■■■■■■■■

850 Professional IC

10

8 9

1

2

3

4

5

6

2

7

2

2

2

11

2

12

2

13

Figure 18

Capillary connections high pressure pump/purge valve

1

Connection capillary
PEEK capillary, connects main piston and
auxiliary piston.

2

PEEK pressure screw, short 6.2744.070

3

Outlet valve holder

4

Pump head 6.2824.110

5

Fastening screws
For fastening the pump head.

6

Inlet valve holder

7

Pump head input capillary
PEEK capillary at the input of the pump
head.

8

Pressure screw
For connecting a PEEK capillary to the cou-
pling (18-

9

).

9

Coupling
For the connection of the eluent path at the
input of the high pressure pump. Can be
ordered together with the pressure screw
(18-

8

) under the number 6.2744.230.

10 Deaerating capillary

For aspirating the eluent when deaerating
the high pressure pump (see Chapter
3.10.2, page 40)
.

11 Purge valve

For deaerating the high pressure pump.
With rotary knob in the center and pressure
sensor.

12 Connection capillary

For connecting the inline filter (see Chapter
3.11, page 42)

13 Connection capillary

Connects the output of the pump head with
the purge valve.

Advertising